GH-Joist Hanger Type TOP M 40x110x1,5

Order no.: 30601TOPM EAN: 4019346122495

GH LINE

TopLine & GreenLine

Anwendungen

 Are you a customer or a new customer? (Specialist trade) 
 For more information about our products, orders, invoices and promotions, log in to our new shop system (account above). 

 

374.76 € / 100 piece
plus VAT.



title:Name
Version: aussenliegend
ETA-08/0264: ETA-08 0264
Wide mm: 40
Height mm: 110
Depth mm: 70
Thickness mm: 1,5
Netto Gewicht Kg: 18,7
Secondary beam2 Ø 5: 8
Secondary/main beam Ø 11: 2
Main beam Ø 5: 14
GreenLine: GreenLine
TopLine: TopLine
Material: S 250 GD +Z 275
Use class: NKL 2
Application: Holz/Holz+Holz/OSB+Holz/Beton
DC Statik: JA
Made in Germany: JA
Statics diagram: Balkenschuhe
Gruppe: Balkenschuhe
HOLZ / BETON: X
HOLZ / HOLZ: X
ETA: ETA-08 0264

equipment

    1 - 18 from 18 Variants
    ID Quantity Wide mm Height mm Depth mm Thickness mm Secondary beam2 Ø 5 Secondary/main beam Ø 11 Main beam Ø 5
    30601TOPM 40 110 70 1,5 8 2 14
    30602TOPM 45 108 70 1,5 8 2 14
    30603TOPM 51 105 70 1,5 8 2 14
    30502TOPM 60 100 70 1,5 8 2 14
    30609TOPM 60 130 70 1,5 10 4 18
    30604TOPM 64 98 70 1,5 8 2 14
    30610TOPM 64 128 70 1,5 10 4 18
    30611TOPM 70 125 70 1,5 10 4 18
    30612TOPM 73 124 70 1,5 10 4 18
    30613TOPM 76 122 70 1,5 10 4 18
    30505TOPM 80 120 70 1,5 10 4 18
    30620TOPM 80 150 70 1,5 12 4 22
    30621TOPM 90 145 70 1,5 12 4 22
    30622TOPM 98 141 70 1,5 12 4 22
    30508TOPM 100 140 70 1,5 12 4 22
    30628TOPM 100 170 70 1,5 14 4 26
    30629TOPM 115 163 70 1,5 14 4 26
    30511TOPM 120 160 70 1,5 14 4 26
    ETA Made in Germany DC Statik

    GH Joist Hanger TOP M Installation aid

    topm_patent

     

    Position the patented installation aid at the bottom edge and press lightly on the top locator prongs to fix the joist hanger.

    The joist hanger pulls itself from the joist at the bottom edge and is therefore fixed precisely flush and at right-angles.

    Installation in the middle of flush at the top If the secondary member is installed in the middle or flush at the top of the main member, both installation aids are pressed directly onto the datum level line.

    As a result, the Top M is aligned at right-angles and fixed without additional aids.

     

    BS TOP

     

    Modern fluted profile

    Locator prong, the third hand during installation

    • Time-saving, fast installation through independent grip

    for further use

    • Easier installation, e.g. for overhead installation

    Ring marking on the nail holes for fast and proper partial

    nailing (40 % fewer nails)

    Beads

    The beads provide additional stability for the joist hangers

    for maximum standards (including 2-axial loading)

    Approved transverse installation

    Joints/connections to German and European approval to:

    • Timber-to-timber

    • via intermediate layer, e.g- OSB

    • only on wood-based panels, e.g. OSB

    • Timber-to-concrete, timber-to-steel

     

    Statikdaten siehe Dokumente (Download)

    Your recently viewed items

    Joist Hanger TOP M Installation aid
    Joist Hanger TOP M Installation aid